| Phase | +Description | +Duration | +Details | +Version | +
|---|---|---|---|---|
| Dcon0 | +Research | ++ | +Research new techniques, draft up architecture design documents and modify the specs. + +During this phase the team looks into new experimental techniques and begins to envision +how the product will evolve during the next phase of the cycle. + | +pre-alpha | +
| Dcon1 | +New features and changes | ++ | +Add big features and merge branches. Risky changes that are likely to +cause bugs or additional work must be done before the end of this phase. + +The first 10 weeks overlap with the Dcon3 & Dcon4 phases of the previous +release, and many developers will focus on bug fixing in those first weeks. + +Developers dedicate a steady 1-2 days/week to the bug tracker, focusing on +triaging and newly introduced bugs. + | +alpha | +
| Dcon2 | +Improve and stabilize | ++ | +Work to improve, optimize and fix bugs in new and existing features. +Only smaller and less risky changes, including small features, should be +made in this phase. + +If a new feature is too unstable or incomplete, it will be reverted before the end of this phase. +Developers spend 2-3 days/week in the bug tracker, triaging, fixing recently introduced or prioritized module bugs. + | +alpha | +
| Dcon3 | +Bug fixing only | +2 months | ++Focus on bug fixing and getting the release ready. + +Development moves to the stable stabilizing branch. In +master Dcon1 for the next release starts. +stable is regularly merged into master. + + +High priority bugs dictate how much time developers will spend in the +tracker as oppose to work on the next release Dcon1 features. + | +beta | +
| Dcon4 | +Prepare release | +2 weeks | ++Stable branch is frozen to prepare for the release. Only critical and carefully reviewed bug fixes allowed. + +Release candidate and release builds are made. +Developers spend a short time 5 days/week with an eye in the tracker for any unexpected high priority regression. + | +release candidate | +
| Dcon5 | +Release | +1 week | ++Stage where the final builds are packaged for all platforms, last tweaks + to the logs, memes, social media, video announcements. + +The final switch is flicked on [dark.fi](https://dark.fi/) for the new +release to show up on the Download page. + | +release | +