chore: roadmap updates 11 12 (#335)

Also did some updates to BI commitments/tasks so they allign more with
the rest of the units and pass the validations
This commit is contained in:
fbarbu15
2025-11-12 19:35:59 +02:00
committed by GitHub
parent 002043b35f
commit 66c3784490
38 changed files with 205 additions and 86 deletions

View File

@@ -37,9 +37,9 @@ extracting key components such as the registrar and advisor and drafting them in
once the draft RFC is assembled, the task also includes preparing the final RFC
as a pull request by incorporating review feedback.
#### Deliverables
* A notion document contains a draft RFC with its feedback.
#### Deliverables
- [Draft RFC for Logos discovery capability](https://www.notion.so/RFC-Logos-Discovery-Capability-28a8f96fb65c80888df7fc0de13f1e22)
- [Logos discovery capability POC](https://github.com/vacp2p/logos-capability-discovery-poc/pull/1)
### Registrar Module
@@ -154,4 +154,4 @@ The task concludes with the merge of the PR.
#### Deliverables
* A PR to the [vacp2p/rfc-index](https://github.com/vacp2p/rfc-index/) repo.
* A PR to the [vacp2p/rfc-index](https://github.com/vacp2p/rfc-index/) repo.

View File

@@ -166,7 +166,7 @@ correctly identifies the corresponding user, and reliably removes their commitme
* fully qualified name: `vac:acz:ift:2025q4-rln-status-l2:shared-db`
* owner: Sylvain
* status: in progress (10%)
* status: in progress (80%)
* start-date: 2025/11/03
* end-date: 2025/11/30
@@ -177,7 +177,8 @@ can write to the shared DB for having a prover cluster based on the pre-research
### Deliverables
* A set of PRs and issues to [vacp2p/status-rln-prover](https://github.com/vacp2p/status-rln-prover).
- Private POC for shared prover DB cluster ([status_rln_prover_db](https://github.com/sydhds/status_rln_prover_db))
- A set of PRs and issues to [vacp2p/status-rln-prover](https://github.com/vacp2p/status-rln-prover).
### Devnet testing

View File

@@ -45,7 +45,7 @@ A set of PRs and issues to [vacp2p/zerokit](https://github.com/vacp2p/zerokit/).
* fully qualified name: `vac:acz:ift:2025q4-zerokit:wasm-ffi-rework`
* owner: Vinh
* status: not started
* status: in progress (30%)
* start-date: 2025/11/03
* end-date: 2025/11/10
@@ -68,9 +68,9 @@ For discussion and context, see: [Zerokit Discussion](https://github.com/vacp2p/
* fully qualified name: `vac:acz:ift:2025q4-zerokit:ffi-rework`
* owner: Vinh
* status: in progress (80%)
* status: done
* start-date: 2025/10/01
* end-date: 2025/11/01
* end-date: 2025/11/11
#### Description
The due date of this task is expanded to 11/01 due to the bugs and test requirements.
@@ -96,7 +96,8 @@ and verification through the new FFI model is implemented and validated
for memory safety and Big Endian compatibility.
#### Deliverables
A set of PRs and issues to [vacp2p/zerokit](https://github.com/vacp2p/zerokit/).
- [Remove legacy FFI implementation in favor of safer opaque structs](https://github.com/vacp2p/zerokit/pull/337)
- A set of PRs and issues to [vacp2p/zerokit](https://github.com/vacp2p/zerokit/).
### Release v1
@@ -110,4 +111,4 @@ A set of PRs and issues to [vacp2p/zerokit](https://github.com/vacp2p/zerokit/).
The new version of the Zerokit v1.0.0.
#### Deliverables
A set of PRs to vacp2p/zerokit repository with [tag v1.0.0](https://github.com/vacp2p/zerokit/releases/tag/v1.0.0)
A set of PRs to vacp2p/zerokit repository with [tag v1.0.0](https://github.com/vacp2p/zerokit/releases/tag/v1.0.0)

View File

@@ -19,7 +19,7 @@ It is a continuous task to extracts and monitore Crypto wallets for the Finance
### Extract Ethereum base wallets
* fully qualified name: `vac:bi:finance:2025q4-finance-wallets-extractions`
* fully qualified name: `vac:bi:finance:2025q4-finance-wallets-monitoring:extract-ethereum-base-wallets`
* owner: apentori
* status: done
* start-date: 2025/10/01
@@ -38,9 +38,9 @@ Schedule note: Dates reflect quarter bounds; update when actual timing is known.
### Improve Dashboard
* fully qualified name: `vac:bi:finance:2025q4-finance-wallets-visualization`
* owner: TBD
* status: not started
* fully qualified name: `vac:bi:finance:2025q4-finance-wallets-monitoring:improve-dashboard`
* owner: c2000bzh
* status: in progress (40%)
* start-date: 2025/10/01
* end-date: 2025/12/31
@@ -51,5 +51,8 @@ Continue on the [issue](https://github.com/status-im/data-docs/issues/83), waiti
Schedule note: Dates reflect quarter bounds; update when actual timing is known.
#### Deliverables
* Adapted visualization dashboard
* Alerting system
- Finance DBT balance processes refreshed (test dataset repopulated after schema drift).
- Treasury dashboard requirements clarified with Deivids/Nacho and queued for implementation.
- Transactions dashboard sanity-checked against `etherscan.io` and wired into the reporting stack.
- Adapted visualization dashboard
- Alerting system

View File

@@ -18,7 +18,7 @@ Extract and build dashboard for X Spaces
### Setup an evaluation process
* fully qualified name: `vac:bi:comm:2025q4-comm-x-spaces-analytics`
* fully qualified name: `vac:bi:ift:2025q4-comm-x-spaces-analytics:setup-evaluation-process`
* owner: c200bzh
* status: in progress (5%)
* start-date: 2025/10/01

View File

@@ -23,7 +23,7 @@ Build Dashboard containing the overview of the Program activity:
### Setup an evaluation process
* fully qualified name: `vac:bi:ift:2025q4-ift-program-dashboard`
* fully qualified name: `vac:bi:ift:2025q4-ift-program-overview:setup-evaluation-process`
* owner: TBD
* status: not started
* start-date: 2025/10/01

View File

@@ -20,7 +20,7 @@ In order to help the Townhall organisation, a list of recent forum post, release
### Prepare Media and Content list for each townhall
* fully qualified name: `vac:bi:ift:2025q4-ift-townhall-content-helper`
* fully qualified name: `vac:bi:ift:2025q4-ift-townhall-helper:prepare-media-and-content`
* owner: nickninov
* status: in progress (60%)
* start-date: 2025/10/01

View File

@@ -0,0 +1,34 @@
---
title: IFT Weekly News Website
tags:
- "2025q4"
- "bi"
- "ift"
draft: false
description: Keep the IFT Weekly News site up to date with the latest Vac/Logos stories and automate ingestion pipelines.
---
`vac:bi:ift:2025q4-ift-weekly-news`
## Description
Maintain and extend the IFT Weekly News Website so it remains the canonical feed for Vac/Logos announcements.
Work includes thematic styling, content ingestion automation, and ensuring partner blogs (Vac.dev, Logos Press Engine, etc.) remain synchronized.
## Task List
### Site maintenance and ingestion
* fully qualified name: `vac:bi:ift:2025q4-ift-weekly-news:site-maintenance`
* owner: c2000bzh
* status: in progress (65%)
* start-date: 2025/10/01
* end-date: 2025/12/31
#### Description
Iterate on the frontend experience while keeping ingestion connectors in sync with the latest content sources.
#### Deliverables
- Refined custom CSS so the weekly news layout matches the current IFT branding.
- Added Vac-related blogs into the Airbyte pipeline so new stories populate automatically.
- Patched the ingestion job to backfill missing Logos Press Engine posts on the news site.

View File

@@ -23,6 +23,7 @@ Additionally, it handle the RAG CaaS to ingest map the internal knowledge of IFT
* [[bi/ift/2025q4-comm-x-spaces-analytics|comm-x-spaces-analytics]]
* [[bi/ift/2025q4-comms-discord-stats|comms-discord-stats]]
* [[bi/ift/2025q4-ift-program-overview|ift-program-overview]]
* [[bi/ift/2025q4-ift-weekly-news|ift-weekly-news]]
* [[bi/ift/2025q4-ift-townhall-helper|ift-townhall-helper]]
* [[bi/ift/2025q4-ift-townhall-transcript|ift-townhall-transcript]]
* [[bi/ift/2025q4-vac-website-contributors|vac-website-contributors]]

View File

@@ -18,7 +18,7 @@ Monitor blogs and Social media to find histories where the logos stack bring sol
### Create Data extraction for social media
* fully qualified name: `vac:bi:logos:2025q4-logos-winnable-stories-sm-extractions`
* fully qualified name: `vac:bi:logos:2025q4-logos-winnable-stories:create-sm-extractions`
* owner: c2000bzh and nickninov
* status: done
* start-date: 2025/10/01
@@ -39,7 +39,7 @@ Airbyte connectors for :
### Find SM Account to monitor
* fully qualified name: `vac:bi:logos:2025q4-logos-winnable-stories-sm-accounts`
* fully qualified name: `vac:bi:logos:2025q4-logos-winnable-stories:find-sm-accounts`
* owner: c2000bzh and nickninov
* status: in progress (50%)
* start-date: 2025/10/01
@@ -56,3 +56,19 @@ Regroup various sources to find the best account to follows
- [Twitter followers retweet investigation dashboard](https://superset.test.bi.status.im/superset/dashboard/twitter_investigation/?native_filters_key=ZgqtlpcsUEI).
- [Twitter account analysis utilities](https://github.com/status-im/bi-utils/pull/6).
- Persona classification method drafted for future automation.
### Launch strategy insights
* fully qualified name: `vac:bi:logos:2025q4-logos-winnable-stories:launch-strategy-insights`
* owner: c2000bzh
* status: in progress (15%)
* start-date: 2025/11/04
* end-date: 2025/12/31
#### Description
Evaluate the Logos launch strategy backlog and identify BI contributions that can turn the plan into measurable dashboards and source coverage.
#### Deliverables
- [Adding new sources to blog extract](https://github.com/status-im/data-docs/issues/118) scoped for implementation.
- [Improving GitHub dashboard with KPIs](https://github.com/status-im/data-docs/issues/119) drafted with proposed metrics and success criteria.

11
content/bi/preview.md Normal file
View File

@@ -0,0 +1,11 @@
---
title: BI Roadmap Preview
tags:
- bi
- vac
---
## Roadmap Preview
### 2026Q1 and beyond
- TBD

View File

@@ -19,9 +19,9 @@ Extract the transcript from Youtube video to use it for RAG context and other po
### Add Code Chunking to the RAG
* fully qualified name: `vac:bi:rag:2025q4-rag-context-code`
* fully qualified name: `vac:bi:rag:2025q4-rag-context-improvement:add-code-chunking`
* owner: nickninov
* status: in progress (5%)
* status: in progress (35%)
* start-date: 2025/10/01
* end-date: 2025/12/31
@@ -32,14 +32,17 @@ https://github.com/status-im/data-docs/issues/82
Schedule note: Dates reflect quarter bounds; update when actual timing is known.
#### Deliverables
* Add task to dagster ETL to include code repository to the RAG context
* Write documentation in Data-docs.
- Updated the RAG upload prefix logic so freshly ingested chunks no longer collide, and backfilled the newest data through the pipeline.
- Patched the Quadrant HTTPS ingestion bug and added monitoring for data freshness as the Quadrant DB grows.
- Expanded the sources dashboard with chunk counts to make it easier to audit what has been loaded.
- Add task to dagster ETL to include code repository to the RAG context
- Write documentation in Data-docs.
### Google Meeting transcript
* fully qualified name: `vac:bi:rag:2025q4-rag-context-google-meet`
* fully qualified name: `vac:bi:rag:2025q4-rag-context-improvement:google-meeting-transcript`
* owner: nickninov
* status: in progress (5%)
* status: in progress (20%)
* start-date: 2025/10/01
* end-date: 2025/12/31
@@ -51,5 +54,6 @@ https://github.com/status-im/data-docs/issues/68
Schedule note: Dates reflect quarter bounds; update when actual timing is known.
#### Deliverables
* Add task to dagster ETL to include meeting transcript to the RAG context.
* Write documentation in Data-docs.
- Debugged the meeting transcript ingestion (YouTube metadata & evaluation pipeline) and documented the outstanding edge cases.
- Add task to dagster ETL to include meeting transcript to the RAG context.
- Write documentation in Data-docs.

View File

@@ -18,7 +18,7 @@ Improve RAG embedding by includind crypto context.
### Improve embedding for the RAG
* fully qualified name: `vac:bi:rag:2025q4-rag-embedding-improvment`
* fully qualified name: `vac:bi:rag:2025q4-rag-embedding-and-context:improve-rag-embedding`
* owner: nickninov
* status: in progress (5%)
* start-date: 2025/10/01
@@ -35,7 +35,7 @@ Schedule note: Dates reflect quarter bounds; update when actual timing is known.
### Named Entity Recognition
* fully qualified name: `vac:bi:rag:2025q4-rag-embedding-named-entity-recognition`
* fully qualified name: `vac:bi:rag:2025q4-rag-embedding-and-context:named-entity-recognition`
* owner: nickninov
* status: not started
* start-date: 2025/10/01

View File

@@ -18,7 +18,7 @@ Setting up a evaluation process for the RAG responses of predefined questions. T
### Setup an evaluation process
* fully qualified name: `vac:bi:rag:2025q4-rag-evaluation-pipeline`
* fully qualified name: `vac:bi:rag:2025q4-rag-evaluation:setup-evaluation-process`
* owner: nickninov
* status: in progress (30%)
* start-date: 2025/10/01

View File

@@ -32,4 +32,5 @@ Schedule note: Dates reflect quarter bounds; update when actual timing is known.
* n8n pipeline to push notification in Status Discord for Twitter post and forum post.
* Documentation in data-docs repo.
* Discord reporting jobs now post the monthly BI report and pull membership data through an improved Airbyte connector.
* Began the Telegram extraction pipeline after aligning on scope with Nenad, ensuring broader coverage of community channels.

View File

@@ -35,7 +35,7 @@ theoretical analysis and experiments.
* fully qualified name: `vac:dst:codex:2025q4-codex-evaluation:codex-in-status`
* owner: Alberto
* status: not started
* status: in progress (70%)
* start-date: 2025/11/03
* end-date: 2025/11/15
@@ -48,4 +48,4 @@ Evaluate if the new feature is working as expected by trying to assert:
2. Presence of messages in status DB
#### Deliverables
- PRs/Issues/Docs/Reports
- PRs/Issues/Docs/Reports

View File

@@ -46,6 +46,7 @@ Should be made general when possible.
#### Deliverables
- PRs:
- [Remove unused _build in regression and fix ENR echo command in Helm template #168](https://github.com/vacp2p/10ksim/pull/168)
- [Github PR: Fix nimlibp2p tracer #161](https://github.com/vacp2p/10ksim/pull/161)
- [Github PR: Move metadata helpers to base_experiment #162](https://github.com/vacp2p/10ksim/pull/162)
- [Github PR: nimlibp2p mix node deployment changes #137](https://github.com/vacp2p/10ksim/pull/137)
@@ -132,7 +133,7 @@ Schedule note: Dates reflect quarter bounds; update when actual timing is known.
* fully qualified name: `vac:dst:ift:2025q4-dst-tooling:complete-deployment-refactor`
* owner: Pearson
* status: in progress (90%)
* status: in progress (80%)
* start-date: 2025/10/06
* end-date: 2025/10/24

View File

@@ -61,6 +61,7 @@ Schedule note: Dates reflect quarter bounds; update when actual timing is known.
#### Deliverables
* Analysis:
* [Notion: Nim-libp2p 1.14.0 Report](https://www.notion.so/Nim-libp2p-v1-14-0-regression-testing-October-2025-28d8f96fb65c803ba789ccdb73753cab)
* [Notion: Quic-9dc03f0e-e63dafa2](https://www.notion.so/Quic-9dc03f0e-e63dafa2-29b8f96fb65c8069a21bf0b2e5c14412#2a38f96fb65c80e7b01cfd885da02b6f)
### Universal connectivity
@@ -156,7 +157,7 @@ Report results of a single scenario (fixed parameters) using K8s and shadow.
* fully qualified name: `vac:dst:vac:2025q4-libp2p-evaluation:rust-libp2p-node`
* owner: Farooq
* status: in progress (25%)
* status: in progress (70%)
* start-date: 2025/10/27
* end-date: 2025/11/07

View File

@@ -56,7 +56,7 @@ Schedule note: Dates reflect quarter bounds; update when actual timing is known.
* fully qualified name: `vac:dst:waku:2025q4-waku-scaling:optimise-browser-bootstrapping`
* owner: Pearson
* status: in progress (50%)
* status: in progress (60%)
* start-date: 2025/10/15
* end-date: 2025/10/31
@@ -176,5 +176,5 @@ Prove that a new node setup with an RLN membership can be ready
to verify RLN proof within 5s, no matter the size of the tree.
#### Deliverables
- Code:
- Report:
- [Github Issue: Check for gasPrice overflow](https://github.com/waku-org/nwaku/pull/3636/files)

View File

@@ -33,7 +33,7 @@ Maintain and extend the foundational Nim libraries required by IFT teams, delive
* fully qualified name: `vac:nim:ift:2025q4-nim-core-libs:command-line-parsers`
* owner: Esteban
* status: in progress (50%)
* status: in progress (60%)
* start-date: 2025/11/15
* end-date: 2025/12/31

View File

@@ -31,7 +31,7 @@ By the end of this quarter, we aim to have made significant progress on these fr
* fully qualified name: `vac:nim:ift:2025q4-nimble:nimble-1.0.0`
* owner: jmgomez
* status: in progress (35%)
* status: in progress (40%)
* start-date: 2025/10/01
* end-date: 2025/12/31
@@ -40,6 +40,9 @@ By the end of this quarter, we aim to have made significant progress on these fr
All the relevant information can be found in [this GitHub issue](https://github.com/nim-lang/nimble/issues/1449).
#### Deliverables
- [Refactor Nim bin parametrization and bootstrap fixes #1514](https://github.com/nim-lang/nimble/pull/1514)
- [Fixes nimble add assertion defect #1512](https://github.com/nim-lang/nimble/pull/1512)
- [Adds call tree to instrumentation #1511](https://github.com/nim-lang/nimble/pull/1511)
- [optimizes some nimblesat funcs #1507](https://github.com/nim-lang/nimble/pull/1507)
- [Adds instrument tools #1506](https://github.com/nim-lang/nimble/pull/1506)
- [Always build installed deps #1505](https://github.com/nim-lang/nimble/pull/1505)

View File

@@ -23,8 +23,8 @@ Enable IPv6 in nim-libp2p end-to-end so users of the library can run dual-stack
### Core transports (tcp/quic)
* fully qualified name: `vac:p2p:ift:2025q4-nimlibp2p-ipv6:transport`
* owner: rramos
* status: not started
* owner: vlado
* status: in progress (50%)
* start-date: 2025/10/01
* end-date: 2025/12/31
@@ -33,8 +33,10 @@ Add IPv6 listen/dial for tcp and quic. Might require changes in chronos
Schedule note: Dates reflect quarter bounds; update when actual timing is known.
#### Deliverables
- nodes can listen on /ip6 and accept inbound requests
- dialer can dial /ip6 addresses
- [Add IPv6 TCP transport tests](https://github.com/vacp2p/nim-libp2p/pull/1850)
- [Add `toMultiAddress` helper for IPv6](https://github.com/vacp2p/nim-libp2p/pull/1853)
- Nodes can listen on /ip6 and accept inbound requests
- Dialer can dial /ip6 addresses
### addresses & identity

View File

@@ -90,6 +90,8 @@ Schedule note: Dates reflect quarter bounds; update when actual timing is known.
- [vacp2p/nim-libp2p#1749](https://github.com/vacp2p/nim-libp2p/pull/1749) chore(kad): tidy up putVal
- [vacp2p/nim-libp2p#1773](https://github.com/vacp2p/nim-libp2p/pull/1773) feat(kad): addProvider
- [vacp2p/nim-libp2p#1789](https://github.com/vacp2p/nim-libp2p/pull/1789) feat(kad): add ProviderManager
- [vacp2p/nim-libp2p#1843](https://github.com/vacp2p/nim-libp2p/pull/1843) chore(kad): ProviderManager limits
- [vacp2p/nim-libp2p#1848](https://github.com/vacp2p/nim-libp2p/pull/1848) chore(kad): Provider manager touchups
### Data Retrieval
@@ -110,6 +112,7 @@ Schedule note: Dates reflect quarter bounds; update when actual timing is known.
- [vacp2p/nim-libp2p#1765](https://github.com/vacp2p/nim-libp2p/pull/1765) chore(kad): getVal loop improvements
- [vacp2p/nim-libp2p#1773](https://github.com/vacp2p/nim-libp2p/pull/1773) feat(kad): addProvider
- [vacp2p/nim-libp2p#1783](https://github.com/vacp2p/nim-libp2p/pull/1783) chore(kad): make key field mandatory
- [vacp2p/nim-libp2p#1852](https://github.com/vacp2p/nim-libp2p/pull/1852) feat(kad): add getProviders
### Discovery

View File

@@ -28,7 +28,7 @@ ensuring that nim-libp2p remains functional and usable for its primary users —
* fully qualified name: `vac:p2p:ift:2025q4-nimlibp2p-maintenance:maintenance`
* owner: rramos
* status: in progress (37%)
* status: in progress (50%)
* start-date: 2025/10/01
* end-date: 2025/12/31
@@ -36,6 +36,14 @@ ensuring that nim-libp2p remains functional and usable for its primary users —
Maintain [nim-libp2p](https://github.com/vacp2p/nim-libp2p) repository via improvements, refactors and bug fixes.
#### Deliverables
- [PR 1858: add utils dir](https://github.com/vacp2p/nim-libp2p/pull/1858)
- [PR 1857: add stream dir](https://github.com/vacp2p/nim-libp2p/pull/1857)
- [PR 1849: add crypto dir tests](https://github.com/vacp2p/nim-libp2p/pull/1849)
- [PR 1845: pubsub improvements](https://github.com/vacp2p/nim-libp2p/pull/1845)
- [PR 1842: add `test_all` bundles](https://github.com/vacp2p/nim-libp2p/pull/1842)
- [PR 1835: fix linter names](https://github.com/vacp2p/nim-libp2p/pull/1835)
- [PR 1832: add license check workflow](https://github.com/vacp2p/nim-libp2p/pull/1832)
- [nim-chronos#586: add `AsyncSemaphore`](https://github.com/status-im/nim-chronos/pull/586)
- [PR 1831: move unittest tests into tools suite](https://github.com/vacp2p/nim-libp2p/pull/1831)
- [PR 1828: imports cleanup across test modules](https://github.com/vacp2p/nim-libp2p/pull/1828)
- [PR 1825: include dangling `testipaddr` file](https://github.com/vacp2p/nim-libp2p/pull/1825)

View File

@@ -33,6 +33,9 @@ Resolve runtime crashes, race conditions and excessive memory use in nim-quic. T
Schedule note: Dates reflect quarter bounds; update when actual timing is known.
#### Deliverables
- [vacp2p/nim-libp2p#1846: use negotiated protocol in pubsub connection lookups](https://github.com/vacp2p/nim-libp2p/pull/1846)
- [vacp2p/nim-libp2p#1844: quic wildcard resolver fixes](https://github.com/vacp2p/nim-libp2p/pull/1844)
- [vacp2p/nim-libp2p#1839: quic EOF handling fixes](https://github.com/vacp2p/nim-libp2p/pull/1839)
- [PR 175: fix timeout handling](https://github.com/vacp2p/nim-quic/pull/175)
- [PR 174: refactor send pipeline](https://github.com/vacp2p/nim-quic/pull/174)
- [PR 167: fix blocked streams](https://github.com/vacp2p/nim-quic/pull/167)

View File

@@ -37,7 +37,7 @@ This taks will need to be broken down into smaller task once we have more info
* fully qualified name: `vac:qa:status:2025q4-status-go-functional-testing:settings`
* owner: aya
* status: in progress (70%)
* status: in progress (80%)
* start-date: 2025/10/01
* end-date: 2025/10/20
@@ -104,8 +104,8 @@ Schedule note: Dates reflect quarter bounds; update when actual timing is known.
### Maintenance
* fully qualified name: `vac:qa:status:2025q4-status-go-functional-testing:maintenance`
* owner: fbarbu15
* status: not started
* owner: roman
* status: in progress (30%)
* start-date: 2025/10/01
* end-date: 2025/12/31
@@ -115,4 +115,5 @@ This includes updating tests for changes in `status-go`, addressing regressions,
investigating and resolving issues, and implementing minor improvements to the testing framework as needed.
#### Deliverables
* PRs with the new tests
- [Temporary guard for `test_update_keycard_uid_success`](https://github.com/status-im/status-go/commit/92cd47e98b4553a9e6b153ef39a55e7205cad6c6)
- PRs with the new tests

View File

@@ -32,10 +32,18 @@ Oversee testing strategy around releases.
to the testing framework as needed.
#### Deliverables
- [tests(@e2e): cover help us improve status dialog](https://github.com/status-im/status-desktop/pull/19217)
- [chore: update status-go](https://github.com/status-im/status-desktop/pull/19216)
- [tests: add test to change language](https://github.com/status-im/status-desktop/pull/19165)
- [bug: Can't mint tokens on Optimism Sepolia](https://github.com/status-im/status-desktop/issues/18954)
- [chore: Optimize code usage](https://github.com/status-im/status-desktop/pull/18980)
- [bug: Cover language selector in e2e](https://github.com/status-im/status-desktop/issues/18983)
- [issue: Account name resets when editing account in settings](https://github.com/status-im/status-desktop/issues/19174)
- [issue: Tests using an old data dir crash on login on latest master](https://github.com/status-im/status-desktop/issues/19176)
- [issue: Fix toplevel window usage](https://github.com/status-im/status-desktop/issues/19237)
- [issue: Run Squish 9.1.0 on mac arm](https://github.com/status-im/status-desktop/issues/19226)
- [issue: Add checks for Help us to improve Status info icon popup](https://github.com/status-im/status-desktop/issues/19173)
- [issue: Biometrics is not fully applied for created profile](https://github.com/status-im/status-desktop/issues/17450)
- [feat: replace old transfer detector](https://github.com/status-im/status-desktop/pull/18924)
- [chore(@e2e): improvement to object definition](https://github.com/status-im/status-desktop/pull/19047)
- [chore: remove TestRail usage from the project](https://github.com/status-im/status-desktop/pull/19100)
@@ -57,6 +65,8 @@ Oversee testing strategy around releases.
- Support releases **2.36** and **2.37** with testing.
#### Deliverables
- [Tested: add withdraw flow fixes](https://github.com/status-im/status-desktop/pull/19180)
- [Tested: release patch set for PR #19227](https://github.com/status-im/status-desktop/pull/19227)
- [fix tests for new component](https://github.com/status-im/status-desktop/pull/19122)
- [issue: test bug fixes](https://github.com/status-im/status-desktop/issues/19152)
- [issue: opened bug follow-up](https://github.com/status-im/status-desktop/issues/19167)

View File

@@ -24,7 +24,7 @@ Extend and adjust the existing E2E test framework to support testing on mobile/t
- fully qualified name: `vac:qa:status:2025q4-status-qa-mobile:port-tests`
- owner: magnus
- status: in progress (40%)
- status: in progress (45%)
- start-date: 2025/10/01
- end-date: 2025/12/31
@@ -70,6 +70,7 @@ Investigate how to extend test hooks to reveal more qt properties to help with t
Add mobile tests to CI mobile build workflow when the pipeline becomes available
#### Deliverables
- [Chore: e2e mobile - add BrowserStack tests](https://github.com/status-im/status-desktop/pull/19111)
- [[Mobile] fix(ci): Android GitHub workflow android-build.yml](https://github.com/status-im/status-desktop/pull/18975)
- [build: add Android x86_64 support to Makefile](https://github.com/status-im/status-go/pull/6990)
- [mobile: add support for browserstack](https://github.com/status-im/status-desktop/issues/19088)

View File

@@ -111,7 +111,7 @@ Update GossipSub performance tests based on dev feedback and existing data gathe
* fully qualified name: `vac:qa:vac:2025q4-nim-libp2p-testing:quic`
* owner: radek
* status: in progress (30%)
* status: in progress (40%)
* start-date: 2025/10/16
* end-date: 2025/11/25
@@ -120,6 +120,8 @@ Improve QUIC transport test coverage for handshake enforcement (TLS, ALPN, trans
stream and connection lifecycle, resilience/error paths, metrics, and interoperability.
#### Deliverables
- [chore: use test_all in coverage workflow](https://github.com/vacp2p/nim-libp2p/pull/1855)
- [test(transports): stream tests](https://github.com/vacp2p/nim-libp2p/pull/1829)
- [test: too many global vars workaround](https://github.com/vacp2p/nim-libp2p/pull/1816)
- [Transports: Inconsistent EOF behavior between QUIC and Mplex: first readOnce after EOF](https://github.com/vacp2p/nim-libp2p/issues/1833)
- [Transports: Inconsistent EOF behavior between QUIC and Mplex: consecutive readOnce after EOF](https://github.com/vacp2p/nim-libp2p/issues/1834)

View File

@@ -22,9 +22,9 @@ Test on selected blockchains to ensure uniform behavior across different deploym
- fully qualified name: `vac:qa:waku:2025q4-rln-smart-contract-testing:property-based`
- owner: romanzac
- status: in progress (95%)
- status: done
- start-date: 2025/10/01
- end-date: 2025/10/31
- end-date: 2025/11/11
#### Description

View File

@@ -47,7 +47,7 @@ editorial work through previous and future RFCs to improve them
- fully qualified name: `vac:rfc:codex:2025q4-rfc-iteration:slot-builder`
- owner: jimstir
- status: in progress (35%)
- status: in progress (55%)
- start-date: 2025/10/01
- end-date: 2025/10/15
@@ -90,7 +90,7 @@ Create the RFC for the purchase module covering pricing, incentives, and settlem
- fully qualified name: `vac:rfc:codex:2025q4-rfc-iteration:the-block-exchange`
- owner: cofson
- status: not started
- status: in progress (10%)
- start-date: 2025/10/04
- end-date: 2025/10/31
@@ -146,7 +146,7 @@ Capture the prover workflow, artefacts, and interface details to support Codex s
- fully qualified name: `vac:rfc:codex:2025q4-rfc-iteration:marketplace`
- owner: cofson
- status: in progress (50%)
- status: in progress (85%)
- start-date: 2025/10/04
- end-date: 2025/11/10

View File

@@ -21,8 +21,8 @@ to fix and update across the relevant RFC websites
### Maintenance
- Fully qualified name: `vac:rfc:ift:2025q4-rfc-index-maintenance:maintenance`
- Owner: Filip
- Status: not started
- Owner: jimstir
- Status: in progress (80%)
- Start date: 2025/10/01
- End date: 2025/12/31
@@ -52,4 +52,4 @@ note them properly.
#### Deliverables
- Fixed version of vac.dev
- Fixed version of vac.dev

View File

@@ -23,8 +23,8 @@ Deliverables include curated study plans, shared notes, and exploratory reposito
### Risc0 Proof of Concepts
* fully qualified name: `vac:sc:logos:2025q4-risc0-upskilling:poc`
* owner: TBD
* status: not started
* owner: Andrea
* status: in progress (20%)
* start-date: 2025/11/01
* end-date: 2025/12/31

View File

@@ -35,8 +35,8 @@ they will be addressed by our team.
### Contract maintenance (recurring)
* fully qualified name: `vac:sc:status-l2:2025q4-maintaining-status-l2-contracts:maintenance`
* owner: sc-team
* status: not started
* owner: r4bbit
* status: in progress (45%)
* start-date: 2025/10/01
* end-date: 2025/12/31
@@ -44,4 +44,5 @@ they will be addressed by our team.
Handle inbound maintenance requests for deployed Status L2 contracts, including bug fixes and minor enhancements.
#### Deliverables
- PRs/Issues/Docs/Reports
- Deployed new SimpleKarmaDistributor instances for live testing
- Fixed the SimpleKarmaDistributor deployment script to initialize distributor parameters correctly

View File

@@ -74,7 +74,7 @@ The Logos website will support the volunteer-driven community building strategy
* fully qualified name: `vac:web:ift:2025q4-logos-website:layout`
* owner: jinhojang6
* status: in progress (50%)
* status: in progress (90%)
* start-date: 2025/05/09
* end-date: 2025/10/31
@@ -88,7 +88,7 @@ Finalize the responsive site layout, navigation structure, and page templates fo
* fully qualified name: `vac:web:ift:2025q4-logos-website:components`
* owner: jinhojang6
* status: in progress (50%)
* status: in progress (90%)
* start-date: 2025/05/09
* end-date: 2025/10/31
@@ -172,7 +172,7 @@ Prototype an interactive map that visualizes Logos circles and makes it easy to
* fully qualified name: `vac:web:ift:2025q4-logos-website:spaces-calendar`
* owner: jinhojang6
* status: in progress (50%)
* status: in progress (90%)
* start-date: 2025/10/20
* end-date: 2025/11/14
@@ -180,7 +180,7 @@ Prototype an interactive map that visualizes Logos circles and makes it easy to
Embed an events calendar that aggregates upcoming Spaces sessions and community gatherings.
#### Deliverables
- Spaces Calendar frontend/backend iteration: [PR21](https://github.com/acid-info/admin-acid.logos.co/pull/21), [preview](https://logos-admin-git-spaces-calendar-features-acidinfo.vercel.app/spaces-calendar?tab=list).
- Spaces Calendar frontend/backend iteration (CSV import, charting, staging deploy): [PR21](https://github.com/acid-info/admin-acid.logos.co/pull/21), [preview](https://logos-admin-git-spaces-calendar-features-acidinfo.vercel.app/spaces-calendar?tab=list).
- Circles calendar proof-of-concept with real Luma data: [PR16](https://github.com/acid-info/logos-co/pull/16), [preview](https://logos-co-rvlb-git-implement-spaces-calendar-acidinfo.vercel.app/spaces-calendar).
- Circles map PoC: [PR15](https://github.com/acid-info/logos-co/pull/15), [preview](https://logos-co-rvlb-git-implement-events-acidinfo.vercel.app/map).
- Confirmed BI data contracts for spaces features ([status-im/data-docs#111](https://github.com/status-im/data-docs/issues/111)).

View File

@@ -27,6 +27,15 @@ Provide upkeep, bug fixes, and small improvements for existing web properties ac
Handle routine maintenance tickets, dependency bumps, and production support for shipped web projects.
#### Deliverables
- [status-web: reference new mobile release assets](https://github.com/status-im/status-web/pull/845)
- [status-web: release new mobile build](https://github.com/status-im/status-web/pull/842)
- [status-website: prepare new mobile release content](https://github.com/status-im/status-website/pull/1620)
- [status-web: fix release CI failing (part 2)](https://github.com/status-im/status-web/pull/844)
- [status-web: fix release CI failing (part 1)](https://github.com/status-im/status-web/pull/838)
- [status-web: deploy websites from monorepo status.app](https://github.com/status-im/status-web/pull/825)
- [status-web: deploy websites from monorepo status.network](https://github.com/status-im/status-web/pull/826)
- [status-web: fix Vercel build](https://github.com/status-im/status-web/pull/836)
- Resolved CSP restrictions for Farewell to Westphalia landing pages and redeployed updated hero video ([logos.co/farewell-to-westphalia](https://logos.co/farewell-to-westphalia))
- Technical SEO improvements for free.technology
- Added dynamic sitemap.xml, robots.txt, Schema.org Structured Data
- [Pull Request](https://github.com/acid-info/free.technology/pull/14), [sitemap.xml](https://free.technology/sitemap.xml), [robots.txt](https://free.technology/robots.txt), [Schema.org](https://validator.schema.org/#url=https%3A%2F%2Ffree.technology%2F)

View File

@@ -26,7 +26,7 @@ The PSF website will support Logos' strategic objectives by:
* fully qualified name: `vac:web:ift:2025q4-psf-website:website`
* owner: jinhojang6
* status: in progress (50%)
* status: in progress (70%)
* start-date: 2025/03/04
* end-date: 2026/10/31
@@ -34,7 +34,8 @@ The PSF website will support Logos' strategic objectives by:
Build the core PSF public site with schedules, speakers, and storytelling that sells the festival experience.
#### Deliverables
- PRs/Issues/Docs/Reports
- [Implement landing page with new visual language and hero video](https://github.com/acid-info/ps.logos.co/pull/10)
- Deployed [ps.logos.co](https://ps.logos.co/) with updated OG metadata and Admin-acid API integration
### Ticketing
@@ -107,4 +108,4 @@ Craft narrative copy that explains PSFs mission, programming, and calls to ac
> https://drive.google.com/file/d/1SbLc778vFessbGpdseeU7LAZuDT1PNPn/view
#### Deliverables
- PRs/Issues/Docs/Reports
- PRs/Issues/Docs/Reports

View File

@@ -40,9 +40,9 @@ The Status Network Hub will support Status Network's strategic objectives by:
* fully qualified name: `vac:web:status:2025q4-sn-hub:wallet-connect`
* owner: jkbktl
* status: in progress (70%)
* status: done
* start-date: 2025/09/05
* end-date: 2025/11/30
* end-date: 2025/11/11
#### Description
Ship the WalletConnect onboarding and session management flows so users can safely link their wallets.
@@ -53,8 +53,8 @@ Ship the WalletConnect onboarding and session management flows so users can safe
### Staking
* fully qualified name: `vac:web:status:2025q4-sn-hub:staking`
* owner: nnachionuwa
* status: in progress (90%)
* owner: isaac
* status: in progress (96%)
* start-date: 2025/09/05
* end-date: 2025/11/30
@@ -62,9 +62,10 @@ Ship the WalletConnect onboarding and session management flows so users can safe
Build the staking dashboard that displays yields, validator options, and lets users manage deposits.
#### Deliverables
- [Completed unstaking flow](https://github.com/status-im/status-web/pull/820)
- [add external links](https://github.com/status-im/status-web/issues/781) - created [PR#818](https://github.com/status-im/status-web/pull/818)
- synced with Filip regarding API and [review of API design](https://github.com/status-im/sn-api/pull/7)
- testing & debugging [Withdraw feature](https://github.com/status-im/status-web/pull/813)
- Synced with Filip regarding API and [review of API design](https://github.com/status-im/sn-api/pull/7)
- Testing & debugging [Withdraw feature](https://github.com/status-im/status-web/pull/813)
### Feedback
@@ -84,7 +85,7 @@ Implement in-app feedback capture so newcomers can report issues and suggest imp
* fully qualified name: `vac:web:status:2025q4-sn-hub:deposit`
* owner: jkbktl
* status: in progress (10%)
* status: in progress (90%)
* start-date: 2025/09/05
* end-date: 2025/11/30
@@ -98,21 +99,21 @@ Design the deposit flow that guides users through bridging assets into the Statu
* fully qualified name: `vac:web:status:2025q4-sn-hub:discovery`
* owner: jkbktl
* status: in progress (70%)
* status: done
* start-date: 2025/09/05
* end-date: 2025/11/30
* end-date: 2025/11/11
#### Description
Surface curated dApps, pools, and governance opportunities in a discovery view tailored to new users.
#### Deliverables
- PRs/Issues/Docs/Reports
- [Discover section rollout](https://github.com/status-im/status-web/pull/808)
### Karma
* fully qualified name: `vac:web:status:2025q4-sn-hub:karma`
* owner: jkbktl
* status: in progress (70%)
* status: in progress (95%)
* start-date: 2025/09/05
* end-date: 2025/11/30
@@ -140,7 +141,7 @@ Add notification preferences and delivery so users receive timely updates about
* fully qualified name: `vac:web:status:2025q4-sn-hub:withdraw`
* owner: jkbktl
* status: in progress (60%)
* status: in progress (95%)
* start-date: 2025/09/05
* end-date: 2025/11/30