acz weekly update

This commit is contained in:
seugu
2024-10-21 20:12:35 +03:00
committed by GitHub
parent fb71665fba
commit 9d9be1ea48
7 changed files with 42 additions and 23 deletions

View File

@@ -30,7 +30,7 @@ We will also strengthen the Premier Research Destination narrative by:
* fully qualified name: `vac:acz:ift:acz-research-destination:zk-think-tank`
* owner: Marvin
* status: in progress (10%)
* status: in progress (15%)
* start-date: 2024/10/07
* end-date: 2024/12/02
@@ -43,4 +43,5 @@ as well as the community as large.
* A notions page to maintain current (and accurate) information on each of IFT's usage of ZK techniques.
* Organize ZK notes in an accessible manner for IFT CCs to get a clear overview or deep dive depending on their needs.
* Write 101-blog on ZK techniques to [vac-dev](https://vac.dev/rlog/).
* Write 101-blog on ZK techniques to [vac-dev](https://vac.dev/rlog/).
* Fiat-Shamir blog post: https://vac.dev/rlog/vac101-fiat-shamir/

View File

@@ -40,7 +40,7 @@ gain support from the Ethereum ecosystem.
* owner: Ramses
* status: in progress (70%)
* start-date: 2024/10/07
* end-date: 2024/10/21
* end-date: 2024/11/04
#### Description
Creation of a detailed RFC describing the protocol for a decentralized verison of MLS. This proposal will include a login phase inspired by SIWE avoiding the centralized components of the latter.
@@ -49,6 +49,22 @@ Creation of a detailed RFC describing the protocol for a decentralized verison o
Several PRs to the deMLS repository
### de-MLS Presentation
* fully qualified name: `vac:acz:ift:de-mls-testnet:presentation`
* owner: Ramses
* status: in progress (60%)
* start-date: 2024/10/14
* end-date: 2024/10/23
#### Description
Creation of a presentation of de-MLS for IFT research call.
#### Deliverables
A presentation that describes the RFC in terms of technical, usage, and implementation point of view.
### Login Specs
* fully qualified name: `vac:acz:ift:de-mls-testnet:login-specs`
@@ -69,9 +85,9 @@ A specification document for scalable, implementable, and decentralized authenti
* fully qualified name: `vac:acz:ift:de-mls-testnet:ef-application`
* owner: Ugur
* status: in progress (0%)
* status: in progress (30%)
* start-date: 2024/10/14
* end-date: 2024/10/28
* end-date: 2024/11/04
#### Description

View File

@@ -1,5 +1,5 @@
---
title: Logos ZK Calls
title: IFT ZK Calls
tags:
- "2024q4"
- "acz"
@@ -9,7 +9,7 @@ description: "Preparation and conducting the ZK meetings"
---
`vac:acz:ift:logos-zk-calls`
`vac:acz:ift:ift-zk-calls`
Preparation and conducting the ZK meetings
## Description
@@ -32,11 +32,11 @@ We will also strengthen the Premier Research Destination narrative by:
## Task List
### Logos ZK Call 1
### IFT ZK Call 1
* fully qualified name: `vac:acz:ift:logos-zk-calls:logos-zk-call-1`
* fully qualified name: `vac:acz:ift:ift-zk-calls:ift-zk-call-1`
* owner: Marvin
* status: not started
* status: started (10%)
* start-date: 2024/10/28
* end-date: 2024/11/04
@@ -48,9 +48,9 @@ Preparing the agenda and possible speakers for the ZK call on 4th November.
A document of a summary of the ZK call 1 meeting to [ZK Notion page](https://www.notion.so/ZK-Call-1198f96fb65c80c7baaac966b3e57ea2).
### Logos ZK Call 2
### IFT ZK Call 2
* fully qualified name: `vac:acz:ift:logos-zk-calls:logos-zk-call-2`
* fully qualified name: `vac:acz:ift:ift-zk-calls:ift-zk-call-2`
* owner: Marvin
* status: not started
* start-date: 2024/11/25

View File

@@ -16,7 +16,7 @@ Publishing a raw RFC specifying libp2p mixnet protocol and implementing a PoC
This commitment entails designing an anonymization layer for gossipsub, and by extension, IFT projects.
The primary objective of this anonymization layer is to serve as a cohesive anonymization solution for gossip-based projects,
with a specific focus on integrating it with the Logos projects Waku and Codex.
with a specific focus on integrating it with the IFT projects Waku and Codex.
The Nomos team is crafting their own anonymization solution due to their unique requirements and their ability to leverage specific traffic patterns to enhance efficiency.
@@ -49,9 +49,9 @@ offering improvements over Tor push.
* fully qualified name: `vac:acz:ift:libp2p-mix-poc:libp2p-integration`
* owner: Akshaya
* status: in progress (70%)
* status: in progress (85%)
* start-date: 2024/10/07
* end-date: 2024/10/21
* end-date: 2024/10/28
#### Description
@@ -66,7 +66,7 @@ Implement protocol handler logic for sender nodes including packet creation and
* fully qualified name: `vac:acz:ift:libp2p-mix-poc:sim-anon-ping`
* owner: Akshaya
* status: not started
* start-date: 2024/10/21
* start-date: 2024/10/28
* end-date: 2024/11/04
#### Description

View File

@@ -14,8 +14,9 @@ description: "Publishing a reviewing document for the cryptography modules of IF
Publishing a reviewing document for the cryptography modules of IFT projects
## Description
Many IFT projects utilize the cryptography as one of the components their architecture. As ACZ team,
we collect all the cryptographical primitives into single commitment, review and compare them to detect potential
Many IFT projects utilize the cryptography as one of the components their architecture.
As ACZ team, we collect all the cryptographical primitives into single commitment,
review and compare them to detect potential
improvable and strong aspects.
By utilizing the think-tank commitment,
@@ -35,7 +36,7 @@ to initiate discussions and contribute to the benefit of the ecosystem.
* fully qualified name: `vac:acz:ift:think-tank:crypto-think-tank`
* owner: Ramses
* status: not started
* status: done
* start-date: 2024/10/21
* end-date: 2024/11/04
@@ -44,7 +45,8 @@ Code review for a KZG implementation performed by Waku and Nomos.
#### Deliverables
A notion page containing the review by Ramses
[A notion page](https://www.notion.so/WiP-Code-review-Nomos-library-1068f96fb65c80338499c9f06e702b41)
containing the review by Ramses
### ZK Consulting Codex 1
@@ -67,7 +69,7 @@ On going explorative, provide notes on zero-knowledge techniques from the litera
* fully qualified name: `vac:acz:ift:think-tank:zk-consulting-codex-2`
* owner: Marvin
* status: in progress (0%)
* status: in progress (13%)
* start-date: 2024/10/07
* end-date: 2024/12/02

View File

@@ -14,7 +14,7 @@ tags:
* [ ] [[acz/ift/libp2p-mix-poc|libp2p-mix-poc]]
* [ ] [[acz/ift/think-tank|think-tank]]
* [ ] [[acz/ift/acz-research-destination-2024q4|acz-research-destination-2024q4]]
* [ ] [[acz/ift/logos-zk-calls-2024q4|logos-zk-calls-2024q4]]
* [ ] [[acz/ift/ift-zk-calls-2024q4|ift-zk-calls-2024q4]]
### `waku:`

View File

@@ -33,7 +33,7 @@ and support projects being built on the Waku network.
* fully qualified name: `vac:acz:waku:adding-timestamp`
* owner: Ekaterina
* status: not started
* status: started (0%)
* start-date: 2024/10/21
* end-date: 2024/10/28