ACZ updates - Week 2 of 2025Q2 (#143)

This commit is contained in:
seugu
2025-04-15 15:23:48 +01:00
committed by GitHub
parent 0f8fd4b2b5
commit af477ffbba
7 changed files with 82 additions and 12 deletions

View File

@@ -90,7 +90,7 @@ A blogpost to [vac.dev/rlog/](https://vac.dev/rlog/)
* fully qualified name: `vac:acz:ift:2025q2-de-mls-tesnet:consensus-rfc`
* owner: Ugur
* status: started (10%)
* status: started (50%)
* start-date: 2025/04/01
* end-date: 2025/04/14

View File

@@ -42,7 +42,7 @@ We will also strengthen the Premier Research Destination narrative by:
* fully qualified name: `vac:acz:ift:2025q2-ift-zk-calls:ift-zk-call-1`
* owner: Marvin
* status: not started
* status: done
* start-date: 2025/04/01
* end-date: 2025/01/07

View File

@@ -58,7 +58,7 @@ Waku integration.
* fully qualified name: `vac:acz:ift:2025q2-libp2p-mix-testnet:dockerize`
* owner: Akshaya
* status: started (0%)
* status: started (40%)
* start-date: 2025/04/1
* end-date: 2025/04/14
@@ -70,6 +70,22 @@ Dockerize the mixified gossipsub poc to be tested.
* PR to [vacp2p/mix](https://github.com/vacp2p/mix) repo.
### Delivering PoC
* fully qualified name: `vac:acz:ift:2025q2-libp2p-mix-testnet:delivering-poc`
* owner: Akshaya
* status: started (50%)
* start-date: 2025/04/01
* end-date: 2025/04/28
#### Description
Delivering the implementation a simple gossipsub PoC over Waku the mixnet.
#### Deliverables
* [A branch for mixified gossipsub](https://github.com/vacp2p/dst-gossipsub-test-node/tree/dockerized-mix-gossipsub)
### Updating RFC
* fully qualified name: `vac:acz:ift:2025q2-libp2p-mix-testnet:update-rfc`
* owner: Akshaya

View File

@@ -48,7 +48,7 @@ We will also strengthen the Premier Research Destination narrative by:
* fully qualified name: `vac:acz:ift:2025q2-rln-status-l2:maintain`
* owner: Ugur
* status: started
* status: started (5%)
* start-date: 2025/04/01
* end-date: 2025/06/30

View File

@@ -44,7 +44,7 @@ to initiate discussions and contribute to the benefit of the ecosystem.
* fully qualified name: `vac:acz:ift:2025q2-think-tank:maintain-1`
* owner: Marvin
* status: started
* status: done
* start-date: 2025/04/01
* end-date: 2025/04/14
@@ -56,15 +56,15 @@ This task is important to diffuse the cryptographic components' how-know across
#### Deliverables
* A document to notion page with latest improvements.
* A document to [notion page](https://www.notion.so/maintain-1-deliverables-1d58f96fb65c804fa388efa9333ee3e7) with latest improvements.
### Maintain-2
* fully qualified name: `vac:acz:ift:2025q2-think-tank:maintain-2`
* owner: Marvin
* status: not started
* start-date:
* end-date:
* start-date: 2025/04/14
* end-date: 2025/04/26
#### Description

View File

@@ -39,7 +39,7 @@ for users looking to integrate RLN into their projects.
### Iden3 Witness Calculator Integration Review
* fully qualified name: `vac:acz:ift:2025q2-zerokit:iden3-witness-review`
* owner: Sylvain
* status: not started
* status: started (70%)
* start-date: 2025/04/01
* end-date: 2025/04/07
@@ -64,7 +64,7 @@ A set of PRs and issues to [vacp2p/zerokit](https://github.com/vacp2p/zerokit/)
### RLN Execution Bottleneck Analysis
* fully qualified name: `vac:acz:ift:2025q2-zerokit:rln-execution-bottleneck`
* owner: Sylvain
* status: not started
* status: started (10%)
* start-date: 2025/04/07
* end-date: 2025/04/14
@@ -99,7 +99,7 @@ A PR to [vacp2p/zerokit](https://github.com/vacp2p/zerokit/) incorporating the i
### Zerokit Wasm Implementation
* Fully qualified name: `vac:acz:ift:2025q2-zerokit:wasm-implementation`
* Owner: Vinh
* Status: started (0%)
* Status: started (80%)
* Start date: 2025/03/31
* End date: 2025/04/14
@@ -117,11 +117,29 @@ ensuring improved performance and maintainability.
The implementation should be submitted as a pull request to `zerokit`
and linked to the issue related to release v0.8.0.
## Parallelization Feasibility Study For rln-wasm
* fully qualified name: `vac:acz:ift:2025q2-zerokit-v0-8:parallel-computation-study`
* owner: Vinh
* status: started (0%)
* start-date: 2025/04/07
* end-date: 2025/04/21
#### Description
After returning the rln-wasm module, it is necessary to investigate
the possibility and necessity to use parallel computation.
#### Deliverables
A working implementation with parellel feature into `zerokit`, ensuring improved performance and maintainability.
The implementation should be submitted as a pull request to `zerokit` and linked to the issue related to release v0.8.0.
### Zerokit maintaining
* fully qualified name: `vac:acz:ift:2025q2-zerokit:zerokit-maintaining`
* owner: Ekaterina
* status: not started
* status: started (5%)
* start-date: 2025/04/01
* end-date: 2025/05/30

View File

@@ -0,0 +1,36 @@
---
title: Nescience Consulting
tags:
- "2025q2"
- "acz"
- "nes"
draft: false
description: "Creating research documents and specifications
for Nescience architecture"
---
`vac:acz:nes:2025q2-nescience-consulting`
Creating research documents and specifications
for Nescience architecture
## Description
ACZ offers review consulting services to Nescience,
acting as a bridge between Nescience researchers and engineers,
facilitating faster and more efficient communication between the two groups.
By utilizing the Nescience Consulting commitment,
we will reinforce the Conduit of Expertise narrative by:
* The Nescience specifications will be reviewed and refined from an engineering perspective.
* Addressing any potential gaps in the architecture, whether theoretical or practical,
if any are identified
* Improve communication between Nescience researchers and developers.
We will also strengthen the Premier Research Destination narrative by:
* This will enable the Nescience project to be more effectively integrated
and introduced into the ecosystem.
## Task List