* added add list items
(cherry picked from commit df6ea35d5bb975c03c7ec0c787bd915f34890ac0)
* bun run lint
* minor changes
---------
Co-authored-by: Adam Gough <adamgough@Mac.attlocal.net>
Co-authored-by: Adam Gough <adamgough@Adams-MacBook-Pro.local>
* update infra and remove railway
* feat(signup): added back to login functionalityfrom OTP page
* remove placeholders from docker commands, simplified login flow
* Revert "update infra and remove railway"
This reverts commit abfa2f8d51.
* improvement(code-structure): move db into separate package
* make db separate package
* remake bun lock
* update imports to not maintain two separate ones
* fix CI for tests by adding dummy url
* vercel build fix attempt
* update bun lock
* regenerate bun lock
* fix mocks
* remove db commands from apps/sim package json
* update infra and remove railway
* improvement(landing): insert prompt into copilot panel from landing, open panel on entry
* Revert "update infra and remove railway"
This reverts commit abfa2f8d51.
* fixes
* remove debug logs
* go back to old env
* update infra and remove railway
* feat(tools): add generic mail sending block/tools, updated docs script
* Revert "update infra and remove railway"
This reverts commit abfa2f8d51.
* remove message id
* updated type
* fix(migrations): downgrade nextjs
* fix(bun): pin bun version in db migrations
* Revert "fix(migrations): downgrade nextjs"
This reverts commit 27b544f22d.
* fix(stripe): use latest version to fix event mismatch issues
* fix enterprise handling
* cleanup
* update better auth version
* fix overage order of ops
* upgrade better auth version
* fix image typing
* change image type to string | undefined
* update infra and remove railway
* feat(webhooks): add idempotency service for all triggers/webhooks
* Revert "update infra and remove railway"
This reverts commit abfa2f8d51.
* cleanup
* ack PR comments
* update infra and remove railway
* feat(logs): added intelligent search to logs
* Revert "update infra and remove railway"
This reverts commit abfa2f8d51.
* cleanup
* cleanup
* update infra and remove railway
* feat(api-keys): add workspace-level api keys
* encrypt api keys
* Revert "update infra and remove railway"
This reverts commit b23258a5a1.
* reran migrations
* tested workspace keys
* consolidated code
* more consolidation
* cleanup
* consolidate, remove unused code
* add dummy key for ci
* continue with regular path for self-hosted folks that don't have key set
* fix tests
* fix test
* remove tests
* removed ci additions
* update infra and remove railway
* fix(file-upload): fix nextjs file upload issue with pdf-parse
* Revert "update infra and remove railway"
This reverts commit b23258a5a1.
* update infra and remove railway
* fix(kb): exclude deleted docs from queries
* Revert "update infra and remove railway"
This reverts commit b23258a5a1.
* update infra and remove railway
* overhaul docs
* added a lot more videos/examples to docs
* Revert "update infra and remove railway"
This reverts commit b23258a5a1.
* remove unused lines
* update start block docs
* update agent docs
* update API block docs
* update function block docs
* update response block docs
* update parallel and router docs
* update workflow docs
* update connections docs
* fix(sheets): fixed google sheets update (#1311)
Google sheets append was sending an invalid shape to the google sheets api. This PR fixes this by having similar logic to what is in append.ts
* fix(serializer): Required-field validation now respects sub-block visibility (#1313)
* audit content
* audit content
---------
Co-authored-by: Vikhyath Mondreti <vikhyath@simstudio.ai>
Co-authored-by: Adam Gough <77861281+aadamgough@users.noreply.github.com>
Co-authored-by: Vikhyath Mondreti <vikhyathvikku@gmail.com>
* update infra and remove railway
* fix(webooks-ui): made spacing more clear, added copy button for webhook URL & fixed race condition for mcp tools/server fetching in the mcp block
* Revert "update infra and remove railway"
This reverts commit 5a8876209d.
* remove extraneous comments
* ack PR comments